THINGS TO KNOW BEFORE INSTALL
CLEAR ALL ITEMS FROM THE SPACE
REMOVE OR COVER ANY DUST SENSITIVE ITEMS
SHARE ANY SPECIAL INSTRUCTIONS WITH THE TEAM
CONSIDER DRY TIMES
Prior to the crews arrival, remove all items from the floor to be coated. Installers are not permitted to move or remove any items from the area unless they have prior approval.
Note items on the walls or on shelves may catch dust and chips that the crew is unable to blow out. All dust sensitive items should be removed or covered. If you would like ideas on how to protect, or where to store your belongings please do not hesitate to call us.
Communicate any specific instructions or considerations with our team, such as preferred entryways or security measures as well as provide a contact number where you can be reached on the installation day for any questions or unforeseen circumstances.
Avoid walking on the new coating for 24 hours after installation. After this period, you can walk on it and close your garage door. No vehicular traffic or stored items for 48 hours. Note that full curing takes 30 days.
GARAGE SPECIFIC APPLICATIONS
110V/240V ELECTRIC NEEDED
IF YOU WOULD LIKE TO BE PRESENT FOR THE APPLICATION
PAYMENT IS DUE UPON COMPLETION
Please note: Your garage door will remain partially open on days of the application. The garage door will be disengaged, lowered and secured with clamps to sit just above the ground. You will need to reengage your garage door before normal use commences. If you need instructions on how to reengage your garage door please give us a call and we can walk you through it.
GFC needs 110v and 240v electric to power equipment needed during the application process. Although GFC is equipped with generators if needed we request the use of an electric on site. Hardwired electricity is more efficient, and environmentally friendly. A Dryer plug can power our equipment in need of 240v electricity.
If you would like to be present for the application, we ask that you keep yourself available all day. Although we try to stay with our planned schedule, on rare occasions we may need to alter our route. Our operations manager will call with changes to let you know when the crew is on the way. If you are not going to be present for the application please make sure we have access to the space all day.
Payment is due upon completion of application and the crew is authorized to take payment. If we do not receive payment in full within 7 days from the last day we are on site a $100 late fee will be added to your invoice and each week thereafter until full payment is received unless other arrangements have been made.
CLEAR ALL ITEMS FROM THE SPACE
Prior to the crews arrival, remove all items from the floor to be coated. Installers are not permitted to move or remove any items from the area unless they have prior approval.
REMOVE OR COVER ANY DUST SENSITIVE ITEMS
Note items on the walls or on shelves may catch dust and chips that the crew is unable to blow out. All dust sensitive items should be removed or covered. If you would like ideas on how to protect, or where to store your belongings please do not hesitate to call us.
SHARE ANY SPECIAL INSTRUCTIONS WITH THE TEAM
Communicate any specific instructions or considerations with our team, such as preferred entryways or security measures as well as provide a contact number where you can be reached on the installation day for any questions or unforeseen circumstances.
CONSIDER DRY TIMES
Please do not walk on the new coating for at least 24 hours following the last day of installation. After this period, you may walk on the coated surface and close your garage door (if applicable) without fear of damage. However, please do not permit any vehicular traffic (e.g., cars, golf carts, etc.) on the newly coated surface and do not return any of your stored items (if applicable) for at least 48 hours. Please also keep in mind coating takes 30 days to fully cure.
GARAGE SPECIFIC APPLICATIONS
Please note: Your garage door will remain partially open on days of the application. The garage door will be disengaged, lowered and secured with clamps to sit just above the ground. You will need to reengage your garage door before normal use commences. If you need instructions on how to reengage your garage door please give us a call and we can walk you through it.
110V/240V ELECTRIC NEEDED
GFC needs 110v and 240v electric to power equipment needed during the application process. Although GFC is equipped with generators if needed we request the use of an electric on site. Hardwired electricity is more efficient, and environmentally friendly. A Dryer plug can power our equipment in need of 240v electricity.
IF YOU WOULD LIKE TO BE PRESENT FOR THE APPLICATION
If you would like to be present for the application, we ask that you keep yourself available all day. Although we try to stay with our planned schedule, on rare occasions we may need to alter our route. Our operations manager will call with changes to let you know when the crew is on the way. If you are not going to be present for the application please make sure we have access to the space all day.
PAYMENT IS DUE UPON COMPLETION
Payment is due upon completion of application and the crew is authorized to take payment. If we do not receive payment in full within 7 days from the last day we are on site a $100 late fee will be added to your invoice and each week thereafter until full payment is received unless other arrangements have been made.