facebook-code

EPOXY INTERIOR FLOOR CONCRETE COATING DAYTON CINCINNATI

INTERIOR Coatings

Epoxy Interior Floor Concrete Coating Dayton Cincinnati Basement Metallic

Interior concrete coatings are a great way to add durability and style to your floors. These coatings come in a variety of colors and finishes, allowing you to customize your basement to your liking. Additionally, concrete coatings can help protect your floors from moisture, which can be a common issue in basements. With the right coating, your interior floors can be transformed into a functional and attractive space for your family to enjoy. Whether you’re looking to create a home gym, a playroom for the kids, or a cozy living space, basement concrete coatings are a smart choice.

Our Previous INTERIOR PROJECTS

ENHANCE YOUR INTERIOR SPACE WITH A METALLIC COATING

Epoxy Interior Floor Concrete Coating Dayton Cincinnati
Epoxy Interior Floor Concrete Coating Dayton Cincinnati Brown whint of Blue Metallic Concrete Coating
Epoxy Interior Floor Concrete Coating Dayton Cincinnati

THE PROCESS

Epoxy Garage Floor Concrete Coating Dayton Cincinnati Grinding Concrete for a concrete floor coating

Prep

Grinding and Profiling To get a concrete surface ready for coating, it's important to prepare it correctly. This involves grinding and profiling the surface to create a mechanical profile that allows for proper adhesion of the coating.

Epoxy Garage Floor Concrete Coating Dayton Cincinnati Throwing flake for a concrete coating

Coat

Specializing in concrete coating installation, we utilize a coating process to provide a durable and long-lasting finish for your concrete surfaces. This process involves applying a base coat, broadcasting decorative flakes (if applicable), and adding a topcoat for protection.

Epoxy Garage Floor Concrete Coating Dayton Cincinnati Throwing flake for a concrete coating
Epoxy Garage Floor Concrete Coating Dayton Cincinnati Top coating a concrete floor coating

Top Coat

As a concrete coating installation company, we apply the topcoat to the concrete after the base coat has been fully cured. The topcoat provides a protective layer, enhances the coating's appearance, and increases its durability.

Contact us today for a consultation and let us help you achieve the level of perfection your space deserves.

(937) 228-2628

THINGS TO KNOW FOR YOUR DAY OF INSTALLATION

CLEAR ALL ITEMS FROM THE SPACE

REMOVE OR COVER ANY DUST SENSITIVE ITEMS

SHARE ANY SPECIAL INSTRUCTIONS WITH THE TEAM

CONSIDER DRY TIMES

Prior to the crews arrival, remove all items from the floor to be coated. Installers are not permitted to move or remove any items from the area unless they have prior approval.

Note items on the walls or on shelves may catch dust and chips that the crew is unable to blow out. All dust sensitive items should be removed or covered. If you would like ideas on how to protect, or where to store your belongings please do not hesitate to call us.

Communicate any specific instructions or considerations with our team, such as preferred entryways or security measures as well as provide a contact number where you can be reached on the installation day for any questions or unforeseen circumstances.

Avoid walking on the new coating for 24 hours after installation. After this period, you can walk on it and close your garage door. No vehicular traffic or stored items for 48 hours. Note that full curing takes 30 days.

GARAGE SPECIFIC APPLICATIONS

110V/240V ELECTRIC NEEDED

IF YOU WOULD LIKE TO BE PRESENT FOR THE APPLICATION

PAYMENT IS DUE UPON COMPLETION

Please note: Your garage door will remain partially open on days of the application. The garage door will be disengaged, lowered and secured with clamps to sit just above the ground. You will need to reengage your garage door before normal use commences. If you need instructions on how to reengage your garage door please give us a call and we can walk you through it. 

GFC needs 110v and 240v electric to power equipment needed during the application process. Although GFC is equipped with generators if needed we request the use of an electric on site. Hardwired electricity is more efficient, and environmentally friendly. A Dryer plug can power our equipment in need of 240v electricity.

If you would like to be present for the application, we ask that you keep yourself available all day. Although we try to stay with our planned schedule, on rare occasions we may need to alter our route. Our operations manager will call with changes to let you know when the crew is on the way. If you are not going to be present for the application please make sure we have access to the space all day.

Payment is due upon completion of application and the crew is authorized to take payment. If we do not receive payment in full within 7 days from the last day we are on site a $100 late fee will be added to your invoice and each week thereafter until full payment is received unless other arrangements have been made.

THINGS TO KNOW FOR YOUR DAY OF INSTALLATION

CLEAR ALL ITEMS FROM THE SPACE

Prior to the crews arrival, remove all items from the floor to be coated. Installers are not permitted to move or remove any items from the area unless they have prior approval.

REMOVE OR COVER ANY DUST SENSITIVE ITEMS

Note items on the walls or on shelves may catch dust and chips that the crew is unable to blow out. All dust sensitive items should be removed or covered. If you would like ideas on how to protect, or where to store your belongings please do not hesitate to call us.

SHARE ANY SPECIAL INSTRUCTIONS WITH THE TEAM

Communicate any specific instructions or considerations with our team, such as preferred entryways or security measures as well as provide a contact number where you can be reached on the installation day for any questions or unforeseen circumstances.

CONSIDER DRY TIMES

Please do not walk on the new coating for at least 24 hours following the last day of installation. After this period, you may walk on the coated surface and close your garage door (if applicable) without fear of damage. However, please do not permit any vehicular traffic (e.g., cars, golf carts, etc.) on the newly coated surface and do not return any of your stored items (if applicable) for at least 48 hours. Please also keep in mind coating takes 30 days to fully cure.

GARAGE SPECIFIC APPLICATIONS

Please note: Your garage door will remain partially open on days of the application. The garage door will be disengaged, lowered and secured with clamps to sit just above the ground. You will need to reengage your garage door before normal use commences. If you need instructions on how to reengage your garage door please give us a call and we can walk you through it. 

110V/240V ELECTRIC NEEDED

GFC needs 110v and 240v electric to power equipment needed during the application process. Although GFC is equipped with generators if needed we request the use of an electric on site. Hardwired electricity is more efficient, and environmentally friendly. A Dryer plug can power our equipment in need of 240v electricity.

IF YOU WOULD LIKE TO BE PRESENT FOR THE APPLICATION

If you would like to be present for the application, we ask that you keep yourself available all day. Although we try to stay with our planned schedule, on rare occasions we may need to alter our route. Our operations manager will call with changes to let you know when the crew is on the way. If you are not going to be present for the application please make sure we have access to the space all day.

PAYMENT IS DUE UPON COMPLETION

Payment is due upon completion of application and the crew is authorized to take payment. If we do not receive payment in full within 7 days from the last day we are on site a $100 late fee will be added to your invoice and each week thereafter until full payment is received unless other arrangements have been made.

Epoxy Garage Floor Concrete Coating Dayton Cincinnati Lifetime Warranty

At GFC Concrete Coatings, we take pride in providing exceptional quality and durability for all residential applications. That's why we offer a lifetime warranty on all our coatings, ensuring that you are protected against delamination and peeling. Trust in our expertise and let us transform your surfaces with coatings that stand the test of time. Experience the difference with GFC Concrete Coatings today!